Project TF entry 4 – It’s been slow going building the second retaining wall. Slow, laborious, tough work – dig, saw a fence post, mallet it in, repeat. Added guide timbers for the deck next to the veg patch, and started to prepare the fence end for the deck frame.
Leave a Reply